Menü
Login
Dossier
10
General requirements to the design
18 Digital planning, construction and operation of pools
18.10
General (Digital planning, construction and operation of pools)
18.30
Building Information Modeling
18.30.20
Relevance of BIM for the entire Life cycle of the building
18.30.30
The IFC interface
18.30.40
Detailing a building model
18.30.50
BIM-Objects
18.30.60
Organisation of the design process with BIM
18.30.70
The switch to BIM and its Effects
18.30.80
The role of the client
18.30.90
Software solutions for BIM
18.30.100
Further use options for BIM data
18.40
Simulations to accompany the design
18.50
Transferring BIM to the construction site
18.60
The digital twin
18.70.10
General (Computer Aided Facility Management)
18.70.20
Structure of the FM
18.70.30
Differentiation between facility management and building management
18.70.40
The operators responsibility
18.80
Support through CAFM
18.90
Maintainance
18.90.10
Relevance of the maintenance
18.90.20
Contents of maintenance
18.90.30
Qualification of employees responsible for the maintenance
18.90.40
Priority of the measures for the Maintenance
18.90.50
Organisation of maintenance
18.90.60
Extent of maintenance
17 Design for a barrier-free and Non-discriminatory use
10 General requirements to the design
19 Building Physics