10
General requirements to the design
- 11.10 Social bonding of the pool infrastructure
- 11.10.10 General (Social bonding of the pool infrastructure)
- 11.10.20 Programme design
- 11.10.30 Definition of pool locations
- 11.10.40 Marketing
- 11.10.50 Usage options
- 11.20 Basics of pool development planning
- 11.20.10 General (Basics of pool development planning)
- 11.20.20 Basis for determining the demand
- 11.20.30 Preparation of a pool demands plan
- 11.20.30.10 Analysis of location and environment
- 11.20.30.20 Demand assessment for schools, clubs and the public
- 11.20.30.30 The needs of swimming sports Clubs and compara-ble user groups
- 11.20.30.40 Determination of the water area of swimming pools for the public
- 11.20.30.50 Market analysis
- 11.20.30.60 Operation concept
- 11.20.30.70 Intercommunal cooperation
- 11.20.30.100 Economical concept
- 11.30 Property, supply and disposal, transport
- 11.30.10 Total space demands
- 11.30.20 Size of the property
- 11.30.30 Consistance of the property
- 11.30.40 Placement and orientation of the swimming pool on the property
- 11.30.50 Supply and disposal
- 11.30.50.10 Energy supply
- 11.30.50.20 Heat Supply
- 11.30.50.30 Electric power supply
- 11.30.60 Water supply
- 11.30.60.10 Drinking water supply
- 11.30.60.20 Natural healing waters
- 11.30.70 Outside air Supply
- 11.30.80 Waste disposal
- 11.50 Rooms
- 11.50.10 Storage rooms
- 11.50.20 Electrical operating rooms
- 11.60 Traffic
- 11.60.10 Pedestrian traffic
- 11.60.20 Road traffic
- 11.60.30 Stationary traffic
- 11.60.40 Lighting of traffic areas